Testing the Conditions

Test the conditions to make sure that they behave as expected:

  1. Load the assistant into Simcenter STAR-CCM+.
  2. Task 1 and Task 2 have condition tabs added to their panels.


  3. Click on the Post-Condition tab in Task 1 and the Pre-Condition tab in Task 2 to expand them and display more information about the condition requirements.


  4. Import the geometry part into Simcenter STAR-CCM+.
    The conditions for both tasks are satisfied and Task 2 becomes available. When a Post-Condition is satisfied, a green checkmark is displayed on the task panel title bar. The object that satisfies the condition is also displayed in the condition tab.