Testing the Conditions
Test the conditions to make sure that they behave as expected:
- Load the assistant into Simcenter STAR-CCM+.
-
Task 1 and Task 2 have condition tabs added to their panels.
-
Click on the
Post-Condition tab in Task 1 and the
Pre-Condition tab in Task 2 to expand them and display more information about the condition requirements.
-
Import the geometry part into
Simcenter STAR-CCM+.
The conditions for both tasks are satisfied and Task 2 becomes available. When a Post-Condition is satisfied, a green checkmark is displayed on the task panel title bar. The object that satisfies the condition is also displayed in the condition tab.