Re-running a Design Study or Selected Designs
After running a design study you can re-run the entire design study with modified settings or selected designs due to run failure.
Re-running the entire design study is usually required when the following generic settings of this design study are modified.
- study type
- input parameters
- responses
- scenes and plots for post-processing
- run and resource settings
Re-running selected designs is particularly useful for few designs that failed during the study run due to the following reasons:
- runtime
- licensing failures
Design Manager uses the settings of the design study to re-run selected designs. Re-running a design updates the design results, such as responses, performance value, or feasability. Note, that re-running a baseline design can change the performance value of other designs in the design study.
In Pre-Allocation Mode, the license reservation for the selected designs is either based on the specified number of Simultaneous Jobs or on the number of selected designs:
- If the number of selected designs is smaller than the number of simultaneous jobs, then the license reservation is based on the number of selected designs.
- If the number of selected designs is higher than or equal to the number of simultaneous jobs, then the license reservation is based on the number of simultaneous jobs.
You can add and remove responses in the design study before you re-run selected designs. Adding and removing parameters is not supported.
Design Manager allows you to re-run designs using one of the following methods:
- Re-running all designs of a design set
- Re-running selected designs from an output table
- Re-running selected designs from a plot
-
To re-run the entire design study with modified settings:
-
To modify the response range and re-run the design study:
-
To run all designs of the design set Error:
-
To re-run selected designs from an output table:
-
To re-run selected designs from a plot:
- Open a plot that displays the designs of interest. See Creating XY Plots and Creating Parallel Coordinates Plots.
-
Select the data point (XY plot) or data line (Parallel Coordinates plot) of a
design that you want to re-run. Use
<Ctrl>
to select multiple designs. - Right-click and select Rerun Designs.
-
To stop or abort a design run, you must stop or abort the respective design
study:
- Right-click the Stop Study or Abort Study, respectively. node and select