Linking Scene Views
To improve understanding of results, you can link multiple scenes so that they move in tandem as you interact with one of them. This visual parallelism allows you to compare and contrast information concurrently without trying to remember views.
The uses of this feature include:
- Different solution times using the same dataset (using the simulation history and solution view):
- Different scalars using the same dataset:
- Different datasets with the same scalar (these images are created from two separate simulation files):
When you are comparing the same scalar, specify the same range in the scalar displayers of each linked scene. That way, the colors represent the scalar values consistently.
Using Scene Links
To set up a link among scenes in a simulation:
- For every scene you wish to link, right-click the scene node (or inside the open scene display) and activate the
Linked View option in the context menu.
A chain-link icon appears at the bottom right corner of the scene node icon.
- To compare different states of a solution history, prepare a duplicate set of objects as follows:
- Make a copy of the scene that shows the solution view.
- Create another solution view by right-clicking the solution history node and selecting Create Recorded Solution View.
- Select the representations of the new solution view for use by the displayers, as well as any annotations, in the new scene.
- Set the Time Step property of each solution view as desired.
- To compare views between simulations, open both simulations and follow the steps.
Note If you have multiple simulations with scene-linking activated, and you do not want to change the views simultaneously, open each simulation in a separate session of the Simcenter STAR-CCM+ client. - To stop simultaneous viewing, deactivate the Linked View option.