Mesh Operations

Mesh operations perform actions on geometry parts that you can easily repeat whenever their input parts or properties are changed.

The result of a mesh operation is a new geometry part or description, but the input parts are not changed.

The following mesh operations are available:

The Operations node holds all mesh operations that are defined in the simulation. An example of how operations, mesh operation parts, and descriptions are linked is provided below.

To reorder the mesh operations:

  1. Right-click the Operations node and select Reorder.
  2. In the Reorder Mesh Operations dialog, drag the mesh operations into a different order then click OK.


Note Reordering is not possible when the action results in the removal of a Mesh Operation Part from an operation. After reordering, operations are updated automatically, which can make some operations out of date.